Works description:
Construction of the foundations of a wind farm.
Works performed:
Execution of the total works necessary to build the foundations of 12 wind turbines. The works carried out were:
- Preparation and assembly of the 676 Tn. of the steel reinforcement.
- Placing of the 12 bolt rings.
- Formwork of foundations and ferrules.
- Concrete works of the 12 foundations, in total were poured 6,200 cubic meters