After the start of the works of EXTENSION OF THE 3RD SET OF SLUICES IN THE PACIFIC OF THE PANAMA CANAL last month of March 2012 for UTE GRUPO UNIDOS POR EL CANAL GUPC formed by SACYR-IMPREGILO-JAN DE NUL-CUSA, we have been awarded an extension contract worth $ 1MM for the execution of the concrete structure of the Lock Head 3.