Execution of the secondary lining of two tunnels, 1,200 and 900 meters in length of the High Speed Rail Galicia-Madrid. The Project includes the execution of the cut-and-cover in the tunnel’s mouth. The 15 meters long formwork traveller have been designed and supplied by Tecozam.