Works description:
A total execution of 8 structures to construct the Kardonbanan railway line from Aby to Händelö, close to Norrköping city. The finished work is composed by 2 overpasses, 1 underpass, 2 viaducts and 2 bridges over the Motala river executed with 22 ml of gantry girder scaffolding system supported on provisolinal brackets welded to the metal jacket of the piers.
Works performed:
Tecozam carried out FRC works including the design and provision of all temporary formwork materials for the structures.