Works description:
Construction of the Gipuzkoa Environmental Complex
Works performed:
- Works of formwork, assembly and concrete pouring for;
8.600 sq m of walls, 14,800 sq m of climbing walls and 5,900 sq m of piers.
For the construction of the 2700 sq m of the formwork of slabs, it was necessary to put, 49.200 cubic meters of full falsework.