TECOZAM group is one of the leading outsourcing companies in civil engineering. Our technical and specialized staff, with extensive experience in civil engineering, makes us and our work and insurance compliance that, backed by the largest construction companies in Spain and in the international field, allows us to be ahead in performing all type of works, land, railway, port and airport infrastructures, and large-scale water works.
Description of the project: The Thames Tideway Tunnel Project, also called the "Super Sewer", is a sewage project in the City of London. Central Section is the longest and most complicated…
+ infoWorks description:- Extension of the Northern Line of London underground network, by 3,2km of new line plus 2 new stations (Battersea & Nine Elms).- Secondary Lining of Tunnels…
+ infoFull execution of one of the three chambers that make up the Sluice of the Pacific, including the area of lock-gates. The work contracted by Tecozam consists fundamentally in the formwork…
+ infoWork description: The Loja Viaduct project, executed in the vicinity of the Granada town of Loja, is a structure designed to provide service to the new Antequera-Granada High-Speed…
+ infoComplete execution of post-tensioned piles V-shaped up to 45 meters high, including the design and the provision of temporary structures, as in the case of climbing formwork.
+ infoWorks description: The new “Gaznata bridge” has a length of 210ml, it is a hyperstatic bridge of mixed type supported by two double piers embedded in the deck dividing…
+ infoThe viaduct belonging to High-speed Madrid-Extremadura railway line, Section: Talayuela-Cáceres, Subsection: Cañaveral-Embalse de Alcantara; has a total length of 1,488…
+ infoComplete execution of 20 piles of the approach viaducts to the central section of the Bridge, including design and provision of temporary structures (climbing formwork and others).
+ infoExecution of the secondary lining of two tunnels, 1,200 and 900 meters in length of the High Speed Rail Galicia-Madrid. The Project includes the execution of the cut-and-cover in the…
+ infoThe contracted works include the complete lining of the tunnel of the left Canda-Via of 7.200 ml. Of length with a section of R = 4.37 m. In vault and 7.62 m wide at the base, including…
+ infoWorks description: Execution of the “Os Portos Viaduct”, consisting of two parallel viaducts, one of them has a length of 236m and another 246m, with 5 piers each one,…
+ infoWorks description: Construction of two entrance tunnels: Erribaso and Arizbakarra tunnels. - Erribaso Entrance tunnel has a vaulted section in the stretch section (130ml) and…
+ info(Finished in 2013) Execution of 44.450,00 m2 of climbing piles of 77.00 m. maximum height and a section of 10.50*4.50 m, all executed with metal molds specially designed for the work.
+ infoComplete execution of all reinforced concrete structures for 5 viaducts at E-75 Highway, Lot I, Section Gredlica – Gomje Poke in Serbia. Including the design and the provision…
+ infoExecution of the 20 metres in height drawing well for bottom outlet and base spillway in the Tailing dam of Itóiz Project for Urrobi and Irati rivers in the Itóiz reservoir.
+ infoExecution of a deck for the LAV-Madrid-Galicia on Ricobayo reservoir in Zamora, Spain, by means of a system of progressive voussoirs executed with two travelling cranes. The deck has…
+ infoComplete construction of two viaducts of the R-2 Higway in Sloavkia, Zvolen-Pstrusa Sector. The execution involves the provision of the scaffolding and deck formwork material necessary…
+ infoExecution of Wind Tower of 120 mts. high in the wind farm of Alaiz, Navarra. This shaft has been built to withstand the loads of the largest machines in the wind market to raise them…
+ infoProject brief outline: Concrete civil works execution (Viaducts, railway station, drainages, overpasses, etc) Main structures carried out: -Shelter structure for the new high…
+ infoBilbao Bizkaia Water Consortium has launched the rain overflow chamber of Etxebarri, which has a capacity of 74,480 cubic meters (m3), which is the rain overflow chamber with the highest…
+ infoTâmega hydroelectric complex is a system composed by three dams and three hydroelectric power plants. Two of them are placed onth Tamega river (Daivões y Alto Tâmega)and…
+ infoWorks description: Construction of the Gipuzkoa Environmental Complex Works performed: Works of formwork, assembly and concrete pouring for; 8.600 sq m of walls, 14,800 sq m of climbing…
+ infoWorks description: Construction of the foundations of a wind farm. Works performed: Execution of the total works necessary to build the foundations of 12 wind turbines. The works carried…
+ infoWorks description: Execution of a dam of loose materials downstream of the existing gravity dam to heighten the water sheet of the reservoir. Works performed: TecoZam has been entrusted…
+ infoWorks description: The approach Viaduct of the “Los Tramposos” Viaduct has a length of 774 m with 38 spans, the first one has a length of 15.5 m and the others 20.5m. each…
+ infoWorks description: A total execution of 8 structures to construct the Kardonbanan railway line from Aby to Händelö, close to Norrköping city. The finished work is composed…
+ infoWorks description: Remodeling of the “Metro Sevilla Station”, located at the very downtown of Madrid, nearby “Puerta del Sol”. Works performed: Formwork and…
+ infoOur compromise and strategy to achieve that a Zamora athlete gets a medal in an Olympic Games is clear, and proof of this is that we have renewed our support for sport by extending…
#TecoZam Group would like to wish you a Merry Christmas and a Happy New Year 2022. We want to send our best wishes to all those who are still fighting against this pandemic that has…
We have had the honor of receiving in our Head Offices in Zamora the Regional Minister of Employment and Industry; Ana Carlota Amigo, the Deputy Regional Minister; David Martín,…
In TecoZam Group we keep working day by day improving the society where we operate, exporting our technology and our R&D processes. We are pleased to inform you that two of our…
The Gómez Rojo brothers, shareholders of the TecoZam Group, would like to thank the Zamora Chamber of Commerce and the jury for the Vulcano 2021 award, but especially, we would…
#ManagementTecoZam We have been certified in the international standard ISO45001:2018 for Occupational Health and Safety Systems since 2020, the year in which the company adapted from…
For GRUPO TECOZAM, protecting the health of professionals is always of the utmost importance, so protecting the health of our colleagues who are exposed to noise on a daily basis is…
This morning I had the pleasure to participate in the meeting of the business round table (Next Generation EU instrument) presided by the President of the Junta de Castilla y Leon…
TecoZam UK, subsidiary of TecoZam Group in the United Kingdom, has been awarded the Building Confidence SSIP Certificate by Achilles. We are proud that our Health and Safety,…
Yesterday we received great news from the #TidewayLondon megaproject that our filial #TecoZamUK is executing in #London. In the range of innovative solutions that we have, we provide…
One of the obligations that companies have is to return a part of themselves to society, and in this case, approved by the #tecozam Group's Management Committee, it has been to donate…
On 16th September, our colleague Jorge Lorenzo, Quality, R+D+i and MA, was awarded the Castilla y León Economic Prize for the Best Executive in the Quality category. …
The TECOZAM Group appears in number 359 of the AENOR magazine (the world leader in management systems certification) to explain our success story in the implementation of the ISO9001…
TecoZam considers the development of areas related to talent management, training and cultural transformation key to its success. Therefore the Lessons Learned conference and employee…
Good afternoon, We leave you the interview that the magazine Castilla y Leon Economica has conducted with our colleague Jorge Lorenzo Fernández recently awarded in the VII Edition…
On February 2, the press reported on the work we are doing in the Alto Támega Hydroelectric Project in Portugal https://www.laopiniondezamora.es/comarcas/2020/02/02/piezas-unicas-e-impresionantes/1220546.html
Ms. Inmaculada García Garrandes, Director of the Delegation of Castile and Leon of AENOR, visited our Head Office to deliver the R&D+i Certificate obtained in our last audits.…
Our subsidiary company in the United Kingdom, TecoZam UK, has been certified by the Achilles Building Confidence. Therefore, TecoZam UK proves a high level of compliance with the Quality,…
We are delighted to announce that Tecozam UK has been shortlisted in the INNOVATION IN TUNNEL LINING category of New Civil Engineer Tunnelling Festival 2019.…
TecoZam with sport, From Grupo TecoZam we want to encourage and promote our sponsored athlete, Carlos Garrote, in his effort to get a place for the next JJ.OO. Tokyo 2020. Therefore,…
Tecozam UK, subsidiary of Tecozam Group in the United Kingdom, has been awarded the Building Confidence Certificate after passing the external audit by Achilles. We are proud that…
TecoZam participates in the forum "8 ideas to succeed in 2019" organized by the magazine CyL Económica and sponsored by Unicaja Banco, where managers of 8 companies of important…
Today October 24th we had the pleasure to receive the visit from AENOR Castilla y Leon branch office Director Mrs. Inmaculada García to our central group offices. AENOR is a…
Published in the Official Bulletin of Industrial Property on September 13, 2018, it becomes our first patent. After the profit model obtained before this summer, we are taking advantage…
For TecoZam Group it is a pride to sponsor Carlos Garrote Ballestero and accompany him in the successes as the newly obtained: World Champion in K-1 200m in the Portuguese town of…
This week, after many agenda problems for both parties, the sponsorship agreement has been renewed with Diego Sebastián Ramos Saldivia, player of the World Padel Tour circle.…
We have been invited to give rackets to children with Down syndrome and children with various disabilities, as well as people in wheelchairs. It is a project led by tennis teacher…
Completion of one carriageway in Os Portos Viaduct, one of the main structures in the High Speed Rail Madrid-Galicia. The Viaduct has been executed with our truss falsework with high…
Tecozam exhibits in the United Kingdom Infrastructure Show (UKIS) taking place last 17th April at the NEC in Birmingham, UK. During the exhibition we were able to promote commercial…
TecoZam ratifies the signing of the sponsorship agreement with one of the players with more future projection of the paddle circuit "World Pádel Tour", Diego Ramos. We wish…
Tecozam announces the Master in Management and Project Management for the year 2016 and 2017 of the Polytechnic University of Zamora in which collaborates as speaker providing expertise…
Tecozam Group has incorporated the subsidiary Tecozam USA Corp. to develop its construction activities in the USA. This is part of the process of our international expansion which…
Next 26th of June will open the new sets of locks of the Panama Canal. Tecozam has been involved in the construction more than 4 hard-working years, from 2012 to date, developing over…
Tecozam United Kingdom Ltd, subsidiary of Tecozam Group in the United Kingdom, has been awarded the execution of the finishing Works of the construction of the energy recovery centre…
The Tecozam Group has been interviewed in the monograph of "Business Excellence" , which has published the newspaper "La Razon" , on May 2 for having been able to adapt and cope with…
After more than two years of hard work the day 11.11.15 concreting the keystone over the Tagus river is performed, thus putting the finishing touch to the execution of the most emblematic…
The viaduct belonging to High-speed Madrid-Extremadura railway line, Section: Talayuela-Cáceres, Subsection: Cañaveral-Embalse de Alcantara; has a total length of 1,488…
It started yesterday about 11:00 am (local time) through a network of pumping with a flow rate of 40,000 m3 / h, coming from Gatun Lake and will flood the Pacific sluices until it…
Tecozam United Kingdom has been awarded the works of formwork, steel framework and concreting for the piles of the approach viaducts on "The Mersey Gateway" project. The "Mersey Gateway"…
Group Tecozam was awarded last September 29th by Ibermutuamur, due to its unique involvement in prevention and occupational health, and also for reducing its loss rate, placing…
Tecozam has been awarded today by FCBC with the prize "100 Days Excellence Award" ("100 days Award of Excellence"), for working for more than 100 days with a high level of security,…
Fernando Martinez Maillo, President of the Provincial Council of Zamora, who is attending this week the VIII Ibero-American Local Government Forum 2013 held in Panama, as the Vice…
GROUP TECOZAM has been awarded the execution of the elevation of the piles of the Provinces and Pontes 1 and 2 viaducts with a total amount of 10,060.00 m2 of climbing formwork…
GROUP TECOZAM has been awarded the execution of concrete structures of the work LAV ANTEQUERA-GRANADA, SECTION QUEJIGARES-VARIANT OF LOJA for the company AZVI, among which is pointed…
After the start of the works of EXTENSION OF THE 3RD SET OF SLUICES IN THE PACIFIC OF THE PANAMA CANAL last month of March 2012 for UTE GRUPO UNIDOS POR EL CANAL GUPC formed by SACYR-IMPREGILO-JAN…